Log in

Housing in Slakthusområdet

Slakthusområdet is getting its first homes right now – the city's target is around 3,000 homes by about 2035, and the first tenants moved into the Kylfacket block in May 2026. What there is to rent or buy is new construction, let and sold by the developers themselves.

We do not list individual sale listings or closing prices; those live with the brokers and the housing portals. Everything on this page is read from the developers' own pages, and the date of the last check is shown below.

Housing projects

Home counts cover the whole project, not what remains unsold right now.

Kvarteret Kylfacket

Fastsam
Etapp 1 Fållankvarteren, mitt i Slakthusområdet

Fastsam is building rental apartments of 1–5 rooms and a number of small commercial units with five of its members – Mandel Fastigheter, Taksprånget, Fahlin Förvaltning, Hemvist Förvaltning and LL Kylfacket – according to its own project page. The city writes 165 rentals and five townhouses in hand-moulded red-black brick, with half of the homes allocated through Bostadsförmedlingen, the city's housing queue. The first tenants moved into the townhouses in May 2026, the district's first residents.

approx. 170 homesOccupancy from May 2026● Selling now

Fransyskan

Besqab
Etapp 1 Fållankvarteren

Condominiums of 1–5 rooms in three buildings of seven to ten storeys, split between two associations, Stora and Lilla Fransyskan. The brick-faced buildings are designed by Andreas Martin-Löf Arkitekter. The flats are released in stages and stage 2 is on sale now, with prices from 2,995,000 kronor for a studio according to Besqab's own page. A preschool in the block and a restaurant, deli or café planned at street level. The showroom is in A House Börshuset at Slakthusplan 3.

122 homesPreliminarily from Q1 2028● Selling now

The Mews

Åke Sundvall
Etapp 1 Fållankvarteren

Nordic Swan certified condominiums designed by Jägnefält Milton and KOD Arkitekter: 50 apartments in North Flats, 46 in South Flats and 23 townhouses of 4–6 rooms modelled on British mews houses, according to Åke Sundvall's page and the project site themews.se. Construction of North Flats is given as starting in Q2 2026, sales are under way, and viewings are held at Fastighetsbyrån's office at Arenavägen 33. The city still counts the block as 102 apartments and 23 townhouses.

In other districts:Åke Sundvall also builds blocks 7 and 9 in Barkarbystaden · Åke Sundvall also builds in Gasverket in Norra Djurgårdsstaden

approx. 119 homesPreliminary occupancy Q3–Q4 2028 for the townhouses, Q4 2028 for the apartments● Selling now

Kylrummet 2

Primula
Etapp 1 Fållankvarteren

Rental apartments let through Bostadsförmedlingen, with access to their own garage, a separate preschool and commercial units at street level, according to Primula's own project page. The city's phase page says 142 apartments and occupancy in spring 2027 – the developer's page prevails.

143 homesOccupancy autumn 2027○ Sales not yet open

Student- och forskarbostäder (K2A)

K2A Knaust & Andersson Fastigheter
Etapp 1 Fållankvarteren

Student and researcher housing of 6,562 square metres in total, let through K2A's own housing queue; construction has begun, with production start in 2026, but letting has not, according to the company's property page. The city splits them into 172 student and 75 researcher flats in two blocks, with a preschool and the sports hall Slakthushallen in the student block, and the symbolic ground-breaking took place on 5 May 2026.

247 homesOccupancy date 2027○ Sales not yet open

Slakthus Ett

Svenska Hem i Bromma
Etapp 1 Fållankvarteren

Condominiums with street-level premises, according to the city. Svenska Hem's own page only takes interest registrations and says the project is being re-planned and the final plans are not ready; what it does promise includes high ceilings, a roof terrace and charging points. The count, 51, is the city's figure on the phase page.

51 homes○ Planned

Selvaag Bostad, Kylrumskvarteren

Selvaag Bostad
Etapp 3 Kylrumskvarteren, södra Slakthusområdet

Homes of 2–5 rooms beside the coming Södra park and the villas of Gamla Enskede, built to the Selvaag Pluss concept with a staffed reception, gym, party room and guest rooms, around 60 garage spaces, at least 600 bicycle spaces and access to a car pool and a pool of cargo and electric bikes, according to Selvaag's own page. The city counts around 165 condominiums in the allocation.

In other districts:Selvaag also builds Barkarby Pluss in Barkarbystaden · Selvaag also builds Terrasskvarteret Pluss in Norra Djurgårdsstaden

190 homesOccupancy 2030, sales start estimated 2028○ Planned

Every fact checked against the developers' own pages on 2026-09-26 or later

Coming phases

The city's phases with construction start, occupancy and unit counts, the metro's timetable – planned for 2030, now expected in 2032 – and the halls that have already reopened are on the building projects page.

Building projects in Slakthusområdet

Prices in the area

Slakthusområdet is not reported separately in the open statistics – the figures are for Enskede-Skarpnäck, which contains the district.

Price per m²
64 876 kr/kvm
Price development
+5.8 %
Homes sold
2 510

Källa: Svensk Mäklarstatistik AB · updated 2026-09-08